AGL was awarded the contract to provide complete logistics support, heavy lifting services, specialized equipment, certified rigging, and engineering site management for the delivery and installation support of a Full Flight Simulator (FFS) at the JAT International Flight Training Center located at Queen Alia International Airport, Jordan.
Manufactured by a leading Canadian flight simulator company, the simulator was transported to Jordan by sea freight. Weighing approximately 10 metric tons and valued at approximately USD 13 million, it represented one of the most advanced and valuable aviation training systems ever delivered to the Kingdom.
While the simulator manufacturer’s engineers were responsible for the assembly and commissioning of the simulator, AGL provided the complete logistics support required to safely unload, lift, move, position, and support the installation of this highly sophisticated aviation asset.
ABOUT This Project
Project Details
Project Name
Flight Simulator Delivery, Heavy Lifting & Installation
Project Client
JAT International Flight Training Center
Project SERVICES
Unpacking, Aassembly, Installation
Project Start Date
Feb 2025
Project End Date
Apr 2025
Destination
Jordan
Scope
AGL provided a complete logistics support solution, including:
- Project Management
- Logistics Planning & Coordination
- Heavy Lifting Operations
- Certified Rigging Services
- Engineering Site Management
- Mobile Crane Operations
- Electric Forklift Operations
- Indoor Equipment Handling
- Internal Transportation & Positioning
- Safety Supervision
- On-Site Logistics Support
Challenges
Handling a Full Flight Simulator requires significantly more than conventional logistics services.
The simulator had to be safely moved and positioned inside a newly constructed training center with limited operating space, requiring exceptional precision and continuous coordination throughout every stage of the operation.
Due to the indoor environment, conventional diesel-powered equipment could not be used. Every movement had to be carefully planned to protect both the simulator and the new facility while maintaining the highest safety standards.
The project demanded precision engineering, specialized lifting techniques, and flawless execution.
Solutions
AGL developed a comprehensive lifting and logistics plan tailored specifically for the project.
Our team mobilized specialized lifting equipment, electric forklifts designed for indoor operations, certified rigging personnel, and an Engineering Site Manager to supervise every phase of the operation.
Working closely with the simulator manufacturer’s installation engineers, AGL coordinated every movement with precision, ensuring the simulator was safely positioned and fully prepared for assembly.
The project was successfully completed without incidents, damage, or operational delays.
Resources
To successfully execute the project, AGL mobilized experienced personnel and specialized equipment, including:
Personnel
- Project Management Team
- Engineering Site Manager
- Certified Rigging Team
- Heavy Equipment Operators
- Logistics Coordinators
- Safety Personnel
Equipment
Every lifting operation was performed according to a detailed lifting plan and international safety standards.
- Mobile Crane
- Electric Forklifts for Indoor Operations
- Heavy-Duty Forklifts
- Specialized Rigging Equipment
- Hydraulic Moving Systems
- Precision Handling Equipment
Project Outcome
The simulator was successfully delivered, positioned, and supported for installation exactly as planned.
The project was completed with:
- Zero Incidents
- Zero Damage
- Zero Operational Delays
- 100% Safe Execution
Following the successful completion of the installation, the JAT International Flight Training Center was officially inaugurated by His Majesty King Abdullah II, highlighting the strategic importance of the facility to Jordan’s aviation training sector.
The successful execution of this project resulted in AGL being awarded a second Full Flight Simulator logistics support project, scheduled for August 2026, further demonstrating the client’s confidence in our technical expertise and operational performance.